Penguard Topcoat is a two-pack epoxy topcoat based on a polyamide cured epoxy resin. This product is a part of a complete system which is certified not to spread surface flames. Penguard Topcoat bases are intermediates and need to be processed before use.
As finishing coat in epoxy systems. Also on concrete where epoxy paints are specified.
APAS approved to specification 2919.
Gloss Glossy
*Measured according to ISO 3233:1998 (E)
All surfaces should be clean, dry and free from contamination. The surface should be assessed and treated in accordance with ISO 8504.
Clean, dry and undamaged compatible primer. Contact your local Jotun office for more information.
The coating may be used on other substrates. Please contact your local Jotun office for more information.
The temperature of the substrate should be minimum 10°C and at least 3°C above the dew point of the air, temperature and relative humidity measured in the vicinity of the substrate. Good ventilation is usually required in confined areas to ensure proper drying. The moisture content in the concrete should not exceed 4 % (by weight). The coating should not be exposed to oil, chemicals or mechanical stress until fully cured.
Mixing 4 parts Comp. A (base) to be mixed thoroughly with 1 part Penguard, Comp. B (curing agent).
Pot life (23°C) 8 hours. (Reduced at higher temp.)
Thinner/Cleaner Jotun Thinner No. 17. Do not use thinner when applied in potable water tanks.
Pressure at nozzle 15 MPa (150 kp/cm², 2100 psi)
Nozzle tip 0.46 - 0.58 mm (0.018-0.023")
Filter Check to ensure that filters are clean.
Drying times are generally related to air circulation, temperature, film thickness and number of coats, and will be affected correspondingly. The figures given in the table are typical with:
Good ventilation (Outdoor exposure or free circulation of air)
Typical film thickness
One coat on top of inert substrate
Normal hardener |
|||
Substrate temperature |
10°C |
23°C |
40°C |
Surface dry |
2,5 h |
1,5h |
0,5 h |
Through dry |
14 h |
6,5h |
3 h |
Cured |
14 d |
7d |
3 d |
Dry to recoat, minimum Dry to recoat, maximum 1 |
14 h |
7h |
3 h |
1. The surface should be free from chalking and contamination prior to application. Best intercoat adhesion occurs when the subsequent coat is applied before the preceding coat is cured. If this is exceeded it may be necessary to roughen the surface.
The given data must be considered as guidelines only. The actual drying time/times before recoating may be shorter or longer, depending on film thickness, ventilation, humidity, underlying paint system, requirement for early handling and mechanical strength etc. A complete system can be described on a system sheet, where all parameters and special conditions could be included.
Typical paint system
Jotacote Universal |
2 x 125 µm |
(Dry Film Thickness) |
Penguard Topcoat |
1 x 50 µm |
(Dry Film Thickness) |
or |
||
Barrier Penguard Express Penguard Topcoat |
1 x 40 µm 1 x 150 µm 1 x 50 µm |
(Dry Film Thickness) (Dry Film Thickness) (Dry Film Thickness) |
Other systems may be specified, depending on area of use
The product must be stored in accordance with national regulations. Storage conditions are to keep the containers in a dry, cool, well ventilated space and away from source of heat and ignition. Containers must be kept tightly closed.
Handle with care. Stir well before use.
16 litres Comp. A in a 20 litre container and 4 litres Penguard, Comp. B (curing agent) in a 5 litre container 4 litres Comp. A in a 5 litre container and 1 litre Penguard, Comp. B (curing agent) in a 1 litre container
Please observe the precautionary notices displayed on the container. Use under well ventilated conditions. Do not breathe or inhale mist. Avoid skin contact. Spillage on the skin should immediately be removed with suitable cleanser, soap and water. Eyes should be well flushed with water and medical attention sought immediately.