Pioner Primer

Product description

Pilot QD Primer is a fast drying, alkyd based primer with zinc phosphate as active corrosion preventing pigments. This product is certified not to spread surface flames, IMO FTPC Part 5 (IMO Res. A.653(16)) / IMO FTPC Annex2 Item 2.2. Compliant in the UK and Ireland as a primer/finish as per environmental protection act guidance PG6/23.

Recommended use

As primer for steel and aluminium structures in moderate, non aggressive environments. Pilot QD Primer is fast drying and resistant against dry heat up to 120°C. Suitable when used in conjunction with Jotun Steelmaster range of Intumescent coatings as part of overall system.

Film thickness and spreading rate

                                                                                 Minimum                       Maximum                      Typical

Film thickness, dry (µm)                                         40                                   125                                 75

Film thickness, wet (µm)                                        70                                   220                                130

Theoretical spreading rate (m²/l)                         14                                    4,5                                  7,5

Comments

Hong Kong rules: Category of paints - Marine maintenance coatings; VOC 420 gms/ltr HK EPD method (Ready to use); Exempt compound - N/A; Specific gravity: 1.58;

Both VOC and Specific gravity values provided are typical values, subject to changes when

different colour involved.

Physical properties

Colour Grey, Red, White

Solids (vol %)* 56 ± 2

Flash point 26ºC ± 2 (Setaflash)

VOC 3,5 lbs/gal (420 gms/ltr) USA-EPA Method 24

390 gms/ltr UK-PG6/23(97). Appendix 3

Gloss Flat

Water resistance Good

Flexibility Good

*Measured according to ISO 3233:1998 (E)

Surface preparation

All surfaces should be clean, dry and free from contamination. The surface should be assessed and treated in accordance with ISO 8504.

Bare steel

Cleanliness: Blast-cleaning to Sa 2½ (ISO-8501-1:2007). Power tool cleaning to min. St 2 (ISO 8501-1:2007) may be acceptable for minor touch-up work, subjected to exposure conditions.

Shopprimed steel

Clean, dry and undamaged approved shopprimer.

Coated surfaces

Clean, dry and undamaged compatible primer. Please contact your local Jotun office for more information.

Other surfaces

For aluminium substrates, thorough washing and sweeping with a nonmetallic blast medium is required.

The coating may be used on other substrates. Please contact your local Jotun office for more information.

Condition during application

The temperature of the substrate should be minimum 3ºC above the dew point of the air, temperature and relative humidity measured in the vicinity of the substrate. Good ventilation is usually required in confined areas to ensure correct drying.

Application methods

Spray Use airless spray

Brush Recommended

Roller Recommended

Application data

Mixing ratio (volume) Single pack.

Thinner/Cleaner Jotun Thinner No. 7

Guiding data airless spray

Pressure at nozzle 15 MPa (150 kp/cm², 2100 psi).

Nozzle tip 0.38-0.53 mm (0.015-0.021").

Spray angle 40-80°

Filter Check to ensure that filters are clean.

Drying time

Drying times are generally related to air circulation, temperature, film thickness and number of coats, and will be affected correspondingly. The figures given in the table are typical with:

  • Good ventilation (Outdoor exposure or free circulation of air)

  • Typical film thickness

  • One coat on top of inert substrate

Substrate temperature

5°C

10°C

23°C

40°C

Surface dry

30 min

20 min

15 min

10 min

Through dry

Dry to recoat, minimum 2

Dry to recoat, maximum 1, 2

2,5h

 

2,5h

2h

 

2h

1,5h

 

1,5h

1h

 

1h

  1. The surface should be free from chalking and contamination prior to application of the subsequent coat.

  2. Pilot QD Primer can be recoated with coatings containing xylene or stronger solvents within 24 hours or after 5 days after application.

The given data must be considered as guidelines only. The actual drying time/times before recoating may be shorter or longer, depending on film thickness, ventilation, humidity, underlying paint system, requirement for early handling and mechanical strength etc. A complete system can be described on a system sheet, where all parameters and special conditions could be included.

Typical paint system

Corrosivity category C2 - medium (ISO 12944):

Pilot QD Primer

40 µm

(Dry Film Thickness)

Pilot II

40 µm

(Dry Film Thickness)

In conjunction with Intumescent coatings:

Pilot QD Primer 75 µm (Dry Film Thickness)

Steelmaster according to steelmaster loading table

Other systems may be specified, depending on area of use

Storage

The product must be stored in accordance with national regulations. Storage conditions are to keep the containers in a dry, cool, well ventilated space and away from source of heat and ignition. Containers must be kept tightly closed.

Handling

Handle with care. Stir well before use.

Packing size

5 and 20 litre container.

Health and safety

Please observe the precautionary notices displayed on the container. Use under well ventilated conditions. Do not breathe or inhale mist. Avoid skin contact. Spillage on the skin should immediately be removed with suitable cleanser, soap and water. Eyes should be well flushed with water and medical attention sought immediately.

 

Скачать: 
.